Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CTM_DRS_COMP -
Message number: 001
Message text: Start date should be earlier than the end date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CTM_DRS_COMP001
- Start date should be earlier than the end date ?The SAP error message
/SAPAPO/CTM_DRS_COMP001
indicates that there is an issue with the date range specified for a certain operation, typically in the context of the SAP Advanced Planning and Optimization (APO) module, particularly in the context of the Demand Planning or Supply Network Planning functionalities.Cause:
The error occurs when the start date specified for a planning operation (like a planning run, forecast, or any other time-based activity) is not earlier than the end date. This can happen due to:
- Incorrect Date Input: The user may have mistakenly entered the start date as later than the end date.
- System Configuration: There may be a configuration issue where the default dates are set incorrectly.
- Data Entry Error: A manual entry error during the planning process.
Solution:
To resolve this error, you can take the following steps:
Check Date Inputs: Review the start and end dates you have entered. Ensure that the start date is indeed earlier than the end date.
Adjust Dates: If you find that the dates are incorrect, modify them accordingly. Set the start date to a date that is earlier than the end date.
Review Planning Parameters: If the dates are being generated automatically, check the planning parameters or settings in the system to ensure they are configured correctly.
Consult Documentation: If you are unsure about the correct date range to use, refer to the relevant SAP documentation or consult with your SAP functional consultant.
Test Changes: After making adjustments, re-run the planning operation to see if the error persists.
Related Information:
/SAPAPO/CTM
for the CTM (Capable-to-Match) planning run.By following these steps, you should be able to resolve the error and proceed with your planning activities in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CTM4740
Characteristic ID &1 has multiple values; only single value is considered
What causes this issue? Characteristic &V1& has multiple values for one of its attributes.System Response The system only considers single v...
/SAPAPO/CTM4718
&1 is not a time-dependent location product hierarchy
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CTM_DRS_COMP002
Invalid planning version
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CTM_DRS_COMP003
Exclusions and ranges will be ignored during order selection
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.