How To Fix /SAPAPO/CTM3300 - Order was scheduled with an earliness of &1 hours


/SAPAPO/CTM3300 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CTM3 -

  • Message number: 300

  • Message text: Order was scheduled with an earliness of &1 hours

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CTM3300 - Order was scheduled with an earliness of &1 hours ?
    The SAP error message /SAPAPO/CTM3300 Order was scheduled with an earliness of &1 hours typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, specifically when using the Capable-to-Match (CTM) functionality. This message indicates that an order has been scheduled to start earlier than the defined constraints or lead times, which can lead to potential issues in production planning and scheduling.
    
    Cause: Lead Time Violations: The order is being scheduled to start before the minimum lead time or processing time defined in the system. Resource Availability: The scheduling algorithm may have found a way to allocate resources that results in an earlier start time than expected.
    Configuration Issues: There may be incorrect settings in the planning parameters or master data that allow for such scheduling. Demand and Supply Mismatch: High demand or changes in supply can lead to aggressive scheduling by the CTM algorithm.
    Solution: Review Scheduling Parameters: Check the scheduling parameters in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker