How To Fix /SAPAPO/CTM1579 - Calendar of resource &1 does not allow the PPMs/PDSs &2 to be scheduled.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CTM1 -

  • Message number: 579

  • Message text: Calendar of resource &1 does not allow the PPMs/PDSs &2 to be scheduled.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CTM1579 - Calendar of resource &1 does not allow the PPMs/PDSs &2 to be scheduled. ?

    The SAP error message /SAPAPO/CTM1579 indicates that there is an issue with the scheduling of Production Process Models (PPMs) or Production Data Structures (PDSs) due to calendar restrictions on the resource. Here’s a breakdown of the cause, potential solutions, and related information:

    Cause:

    1. Calendar Configuration: The resource associated with the PPMs/PDSs has a calendar that does not allow scheduling during the requested time period. This could be due to non-working days, holidays, or specific time slots being blocked.
    2. Resource Availability: The resource may not be available for the entire duration required for the PPM/PDS, leading to a conflict with the scheduling.
    3. Incorrect Time Settings: The time settings for the resource calendar may not align with the production requirements, causing scheduling conflicts.

    Solution:

    1. Check Resource Calendar:

      • Go to the resource master data and check the calendar assigned to the resource.
      • Ensure that the calendar allows for the required scheduling times. Adjust the calendar to include necessary working days and times.
    2. Adjust PPM/PDS Settings:

      • Review the PPMs/PDSs to ensure they are set up correctly and that their scheduling requirements align with the resource's availability.
      • If necessary, modify the PPM/PDS to fit within the available scheduling window of the resource.
    3. Resource Availability:

      • Verify the availability of the resource during the required scheduling period. If the resource is not available, consider using an alternative resource or rescheduling the production.
    4. Check for Conflicts:

      • Look for any existing orders or activities that may be conflicting with the scheduling of the PPMs/PDSs on the resource.
    5. Consult Documentation:

      • Review SAP documentation or help resources for additional insights on calendar settings and scheduling in SAP APO.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/CTM for the Capable-to-Match (CTM) planning or /SAPAPO/RESB for resource planning to analyze and adjust settings.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on this error message.
    • User Roles: Ensure that you have the necessary permissions to make changes to resource calendars and PPM/PDS settings.

    By following these steps, you should be able to resolve the error and successfully schedule the PPMs/PDSs. If the issue persists, consider reaching out to your SAP support team for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author