How To Fix /SAPAPO/CTM1505 - Demand date &1 does not lie in the planning period


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CTM1 -

  • Message number: 505

  • Message text: Demand date &1 does not lie in the planning period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CTM1505 - Demand date &1 does not lie in the planning period ?

    The SAP error message /SAPAPO/CTM1505 Demand date &1 does not lie in the planning period typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when working with the Capable-to-Match (CTM) planning function. This error indicates that the demand date specified in the planning run does not fall within the defined planning period.

    Cause:

    1. Planning Period Configuration: The planning period may not be set correctly in the system. The demand date falls outside the start and end dates of the planning horizon.
    2. Demand Data Issues: The demand data being processed may have dates that are not aligned with the planning period.
    3. Master Data Settings: The master data for the product or location may not be configured correctly, leading to discrepancies in the planning period.
    4. Time Bucket Settings: The time buckets defined in the planning book may not cover the demand date.

    Solution:

    1. Check Planning Period Settings:

      • Go to the planning area settings and verify the planning period configuration. Ensure that the start and end dates encompass the demand date in question.
      • Adjust the planning period if necessary to include the required dates.
    2. Review Demand Data:

      • Inspect the demand data for any entries that fall outside the planning period. Correct any erroneous dates in the demand data.
      • Ensure that the demand is being generated or transferred correctly into the planning area.
    3. Adjust Master Data:

      • Review the master data for the relevant product or location. Ensure that the planning parameters are set correctly and that they align with the demand data.
    4. Modify Time Buckets:

      • Check the time bucket settings in the planning book. Ensure that the time buckets are defined to cover the range of demand dates.
    5. Run Planning with Correct Parameters:

      • After making the necessary adjustments, rerun the planning process to see if the error persists.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/CTM for running CTM or /SAPAPO/SDP94 for demand planning to check and adjust settings.
    • Documentation: Refer to SAP Help documentation for detailed information on configuring planning periods and demand management in APO.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.

    By following these steps, you should be able to resolve the error and ensure that the demand dates are within the planning period.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant