How To Fix /SAPAPO/CTM1469 - Planning run was terminated


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CTM1 -

  • Message number: 469

  • Message text: Planning run was terminated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CTM1469 - Planning run was terminated ?

    The SAP error message /SAPAPO/CTM1469 Planning run was terminated typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, specifically during a planning run in the Capacity Planning or Supply Network Planning (SNP) processes. This error indicates that the planning run did not complete successfully, and it can be caused by various issues.

    Causes:

    1. Data Issues: Missing or inconsistent master data (e.g., materials, resources, or production versions) can lead to planning run failures.
    2. Configuration Errors: Incorrect settings in the planning run profile or planning area can cause the run to terminate.
    3. Resource Constraints: If there are insufficient resources or capacity defined in the system, the planning run may not be able to allocate production or transportation.
    4. Locking Issues: If another process is locking the data that the planning run needs to access, it may lead to termination.
    5. Memory or Performance Issues: Insufficient memory or system resources can cause the planning run to fail, especially for large datasets.
    6. Errors in the Planning Algorithm: If there are issues with the algorithms used in the planning run, it may lead to termination.

    Solutions:

    1. Check Logs: Review the detailed logs of the planning run to identify the specific cause of the termination. You can find logs in transaction /SAPAPO/CTM or by using transaction SLG1 for application logs.
    2. Validate Master Data: Ensure that all necessary master data is complete and consistent. Check for missing materials, resources, or other relevant data.
    3. Review Configuration: Verify the settings in the planning run profile and planning area. Ensure that they are correctly configured for the intended planning run.
    4. Check Resource Availability: Ensure that the resources required for the planning run are available and properly defined in the system.
    5. Monitor System Performance: Check system performance and memory usage. If necessary, increase the resources allocated to the SAP system or optimize the planning run to handle smaller datasets.
    6. Run in Debug Mode: If the issue persists, consider running the planning run in debug mode to identify the exact point of failure.
    7. Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address known issues related to this error message.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as /SAPAPO/CTM for planning runs, SLG1 for application logs, and SCC4 for client settings.
    • SAP Documentation: Refer to the official SAP documentation for APO and CTM for detailed guidance on configuration and troubleshooting.
    • SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to diagnose and resolve the issue causing the /SAPAPO/CTM1469 Planning run was terminated error.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant