How To Fix /SAPAPO/CTM1440 - ==> &1 demands only partially fulfilled, but on time


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CTM1 -

  • Message number: 440

  • Message text: ==> &1 demands only partially fulfilled, but on time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CTM1440 - ==> &1 demands only partially fulfilled, but on time ?

    The SAP error message /SAPAPO/CTM1440 indicates that a demand (or requirement) has been partially fulfilled, but the fulfillment occurred on time. This message is typically related to the Advanced Planning and Optimization (APO) module in SAP, particularly in the context of the Capable-to-Match (CTM) planning process.

    Cause:

    The error message /SAPAPO/CTM1440 can occur due to several reasons:

    1. Insufficient Supply: The available supply (e.g., production, stock) is not enough to meet the total demand, leading to partial fulfillment.
    2. Planning Parameters: The planning parameters set in the system (like lot sizes, safety stock, etc.) may restrict the amount of demand that can be fulfilled.
    3. Resource Constraints: There may be constraints on resources (like production capacity, labor, or machine availability) that limit the ability to fulfill the demand completely.
    4. Order Prioritization: If there are multiple demands and the system prioritizes certain orders over others, some demands may only be partially fulfilled.
    5. Time Constraints: The demand may have specific time constraints that allow for partial fulfillment to be considered acceptable.

    Solution:

    To address the issue indicated by the error message, consider the following steps:

    1. Review Supply and Demand: Check the supply situation to see if there is enough stock or production capacity to meet the demand. Adjust production plans or stock levels if necessary.
    2. Adjust Planning Parameters: Review and adjust the planning parameters in the APO system. This may include modifying lot sizes, safety stock levels, or other relevant settings.
    3. Check Resource Availability: Ensure that the resources required for fulfilling the demand are available. If there are constraints, consider reallocating resources or adjusting production schedules.
    4. Prioritize Orders: If there are multiple demands, review the prioritization logic in the system. Ensure that critical demands are being fulfilled as needed.
    5. Analyze Demand Patterns: Look for patterns in demand that may indicate a need for better forecasting or planning strategies. This can help in aligning supply with demand more effectively.
    6. Consult Documentation: Refer to SAP documentation or support resources for specific guidance related to the CTM process and error messages.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/CTM to access the CTM planning interface or /SAPAPO/SDP94 for demand planning.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide additional guidance on handling this error message.
    • Training and Support: Consider training for users involved in planning and optimization processes to better understand how to manage supply and demand effectively in SAP APO.

    By following these steps, you should be able to identify the root cause of the partial fulfillment and take appropriate actions to resolve the issue.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker