Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: /SAPAPO/CTM1 -
Message number: 397
Message text: Location product &1/&2 is also main receipt of source of supply &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CTM1397
- Location product &1/&2 is also main receipt of source of supply &3 ?The SAP error message
/SAPAPO/CTM1397
indicates that there is a conflict in the configuration of a location product in the Advanced Planning and Optimization (APO) module, specifically in the context of the Capable-to-Match (CTM) planning process. The error message states that the location product (identified by &1 and &2) is also the main receipt of a source of supply (identified by &3). This typically occurs when the system is trying to plan or allocate resources, but the configuration does not allow for the specified setup.Cause:
- Main Receipt Conflict: The location product is set as a main receipt for a source of supply, which means it is expected to receive products from that source. However, the same location product is also being treated as a source of supply for another product, leading to a conflict in the planning logic.
- Incorrect Master Data Configuration: The master data for the location product or the source of supply may not be set up correctly, leading to this conflict.
- Planning Parameters: The planning parameters or settings in the CTM configuration may not be aligned with the intended supply chain design.
Solution:
- Review Master Data: Check the master data for the location product and the source of supply. Ensure that the location product is not incorrectly set as both a source of supply and a main receipt for the same source.
- Adjust Planning Parameters: Review the CTM planning parameters and settings. Make sure that the configuration allows for the intended flow of goods and does not create circular dependencies.
- Change Receipt Assignment: If necessary, change the assignment of the main receipt for the source of supply to another location product that does not conflict with the current setup.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on configuring location products and sources of supply in CTM.
- Testing: After making changes, run a test planning run to ensure that the error does not reoccur and that the planning logic works as intended.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP APO expert or reach out to SAP support for further assistance.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CTM1396
Bucket-oriented planning does not support this resource type
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CTM1395
Location product &1/&2 can only be replaced and cannot be procured
What causes this issue? Product &V1& in location &V2& is contained in an FFF subgroup and is <ZH>not</> flagged as a lead...
/SAPAPO/CTM1398
Component &1 in in-house-production source of supply &2 is a sub product
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CTM1399
Settings for cont. planning, PP/DS master data and PP/DS orders were made
What causes this issue? You have set the 'Consider Characteristics' indicator in order to CTM considers characteristics of orders during pl...
Click on this link to search all SAP messages.