Message type: E = Error
Message class: /SAPAPO/CTM1 -
Message number: 321
Message text: Input components are always consumed at the start of an activity
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CTM1321
- Input components are always consumed at the start of an activity ?The SAP error message /SAPAPO/CTM1321 indicates that input components are always consumed at the start of an activity in the context of SAP Advanced Planning and Optimization (APO), specifically within the Capacity Planning and Production Planning modules. This message typically arises when there is a configuration or planning issue related to how components are consumed during production activities.
Cause: Consumption Strategy: The error often occurs when the consumption strategy for the production activity is set to consume all input components at the start of the activity, which may not align with the actual production process. Activity Definition: The activity definition in the planning book or the production process may not be set up correctly, leading to the system interpreting that all components should be consumed at the beginning. Master Data Configuration: Issues with the master data, such as the bill of materials (BOM) or production resources/tools (PRT), can also lead to this error if
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CTM1320
CTM time stream &1 is not used in any CTM profile
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CTM1319
Activity &1 has no output components and no successors
What causes this issue? So that CTM planning can process in-house production sources of supply correctly, the following prerequisites must be met: th...
/SAPAPO/CTM1322
Output components are always available at the end of an activity
What causes this issue? You have specified a material consumption type for the current activity, but it is not currently supported by CTM planning.Sy...
/SAPAPO/CTM1323
Logical component &1 has no product
What causes this issue? CTM planning can only process a PPM if at least one product is assigned to each logical component.System Response The system...
Click on this link to search all SAP messages.