Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CTM1 -
Message number: 312
Message text: Inconsistent lot size entries for selection of source of supply &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CTM1312
- Inconsistent lot size entries for selection of source of supply &1 ?The SAP error message
/SAPAPO/CTM1312
indicates that there are inconsistent lot size entries for the selection of a source of supply in the Advanced Planning and Optimization (APO) module, specifically in the context of the Capable-to-Match (CTM) functionality. This error typically arises when the system encounters discrepancies in the lot size settings for the materials or sources of supply being considered during the planning process.Cause:
- Inconsistent Lot Size Settings: The lot size settings for the materials or sources of supply may not be aligned. For example, one source of supply may have a different lot size defined compared to another, leading to inconsistencies.
- Missing or Incorrect Master Data: The material master data or the source of supply master data may be incomplete or incorrectly configured, particularly in terms of lot size parameters.
- Planning Version Issues: If different planning versions are being used, there may be inconsistencies in the lot size definitions across those versions.
- CTM Configuration: The configuration settings for CTM may not be properly set up, leading to issues in how the system interprets lot sizes.
Solution:
Review Lot Size Settings: Check the lot size settings for the materials and sources of supply involved. Ensure that they are consistent and correctly defined in the material master and source of supply master data.
- Transaction Codes: Use
MM02
to check material master data andMD04
to view stock/requirements list.Check Master Data: Ensure that all relevant master data is complete and correctly configured. This includes checking the material master, source of supply, and any relevant planning parameters.
Validate Planning Versions: If you are using multiple planning versions, ensure that the lot size settings are consistent across these versions.
CTM Configuration: Review the CTM configuration settings in the system. Ensure that the settings for lot sizes are correctly defined in the CTM profile.
- Transaction Code: Use
SPRO
to access the configuration settings.Run Consistency Checks: Use the consistency check tools available in SAP APO to identify and resolve any inconsistencies in the master data or planning settings.
Consult Documentation: Refer to SAP documentation or notes related to CTM and lot size settings for additional guidance and best practices.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve the inconsistency in lot size entries.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CTM1311
Inconsistent validity period for in-house prod. source of supply &1
What causes this issue? The master data check issues this message in the following cases: No validity start date is specified No validity end date is...
/SAPAPO/CTM1310
Location product &1 and &2 is not contained within the planning scope
What causes this issue? The system cannot use the corresponding source of supply in a CTM planning run. As standard, the system ends the CTM planning...
/SAPAPO/CTM1313
Source of supply &1 has no operations
What causes this issue? CTM planning cannot process in-house production sources of supply without operations.System Response The system issues an er...
/SAPAPO/CTM1314
Source of supply &1 has activities with no operations assigned
What causes this issue? CTM planning cannot process in-house production sources of supply with activities that are not assigned to an operation.Syste...
Click on this link to search all SAP messages.