Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CTM1 -
Message number: 308
Message text: Lot size entries for product &1 and location &2 are inconsistent
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CTM1308
- Lot size entries for product &1 and location &2 are inconsistent ?The SAP error message
/SAPAPO/CTM1308
indicates that there are inconsistencies in the lot size entries for a specific product and location in the Advanced Planning and Optimization (APO) module, particularly in the context of the Capable-to-Match (CTM) functionality. This error typically arises when the lot size settings for a product at a specific location do not align with the expected configuration or rules defined in the system.Cause:
- Inconsistent Lot Size Settings: The lot size settings for the product at the specified location may not be defined correctly or may be missing. This can happen if the lot size is not maintained in the master data or if there are conflicting settings.
- Different Lot Size Types: The product may have different lot size types defined in the master data (e.g., fixed lot size, lot-for-lot, etc.) that are not compatible with the planning strategy or the CTM settings.
- Data Maintenance Issues: There may be issues with how the data was maintained in the system, such as incorrect entries or missing data in the product master or location master.
Solution:
- Check Lot Size Settings: Go to the product master data (transaction code
MM03
for material master) and check the lot size settings for the product at the specified location. Ensure that the lot size is defined correctly and consistently.- Review Planning Parameters: Check the planning parameters for the product in the APO system. Ensure that the lot size type is compatible with the planning strategy being used.
- Maintain Consistent Data: If there are inconsistencies, update the lot size settings to ensure they are consistent across all relevant master data. This may involve updating the product master, location master, or any relevant planning books.
- Run Consistency Checks: Use the consistency check tools available in SAP APO to identify and resolve any inconsistencies in the master data.
- Consult Documentation: Review SAP documentation or help resources for specific guidance on lot size settings and their implications in CTM.
Related Information:
MM03
- Display Material MasterMD04
- Stock/Requirements ListCTM
- Capable-to-Match PlanningBy following these steps, you should be able to identify and resolve the inconsistency causing the /SAPAPO/CTM1308
error message.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CTM1307
No base unit of measure was maintained for product &1 and location &2
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
/SAPAPO/CTM1306
No available capacity for resource &1 at location &2
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
/SAPAPO/CTM1309
Available capacity was not checked for resource &1, location &2
What causes this issue? You have called the CTM master data check without specifying a planning version.System Response The system issues an error m...
/SAPAPO/CTM1310
Location product &1 and &2 is not contained within the planning scope
What causes this issue? The system cannot use the corresponding source of supply in a CTM planning run. As standard, the system ends the CTM planning...
Click on this link to search all SAP messages.