Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CMDS_SCO -
Message number: 864
Message text: The date of the schedule line lies in the past, check the date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CMDS_SCO864
- The date of the schedule line lies in the past, check the date ?The SAP error message
/SAPAPO/CMDS_SCO864
indicates that there is an issue with the date of a schedule line in the Advanced Planning and Optimization (APO) module. Specifically, it means that the date associated with the schedule line is in the past, which is not acceptable for processing in the system.Cause:
- Past Date: The most straightforward cause is that the date entered for the schedule line is earlier than the current date.
- Data Entry Error: There may have been a mistake during data entry, leading to an incorrect date being assigned.
- System Configuration: The system may have specific settings that prevent processing of past dates for certain operations.
- Master Data Issues: The master data (like material master, vendor master, etc.) may have incorrect or outdated information that affects scheduling.
Solution:
- Check the Date: Review the schedule line date and ensure it is set to a future date. Update it if necessary.
- Data Entry Correction: If the date was entered incorrectly, correct it in the relevant transaction or master data.
- Review Configuration: Check the configuration settings in the APO system to see if there are any restrictions on scheduling that need to be adjusted.
- Update Master Data: Ensure that all relevant master data is up to date and correctly configured to avoid similar issues in the future.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on handling schedule lines and dates.
Related Information:
/SAPAPO/SDP94
(for planning) or /SAPAPO/MC90
(for master data) to access and modify relevant data.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CMDS_SCO863
Period indicator & is not defined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CMDS_SCO862
Date &1 with period &2 is invalid
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CMDS_SCO865
The period for the schedule line lies in the past, check the period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CMDS_SCO866
Could not create forecast header because of missing parameter
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.