How To Fix /SAPAPO/CMDS_SCO038 - Requirements date cannot be met


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CMDS_SCO -

  • Message number: 038

  • Message text: Requirements date cannot be met

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CMDS_SCO038 - Requirements date cannot be met ?
    The SAP error message /SAPAPO/CMDS_SCO038 indicates that the requirements date for a specific order or demand cannot be met due to various reasons. This error typically arises in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with supply chain planning and scheduling.
    Causes:
    
    Capacity Constraints: The production or resource capacity may be insufficient to meet the demand by the required date.
    Material Availability: The required materials may not be available in stock or may not be scheduled to arrive in time.
    Lead Times: The lead times for production or procurement may be longer than the time available to fulfill the requirement.
    Scheduling Conflicts: There may be conflicts in the scheduling of production orders or other activities that prevent meeting the requirement date.
    Incorrect Planning Parameters: Incorrect settings in the planning parameters, such as safety stock levels, reorder points, or lot sizes, can lead to this error.
    Demand Changes: Sudden changes in demand

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant