How To Fix /SAPAPO/CLPRP159 - Scheduling cannot be carried out


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CLPRP -

  • Message number: 159

  • Message text: Scheduling cannot be carried out

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CLPRP159 - Scheduling cannot be carried out ?

    The SAP error message /SAPAPO/CLPRP159 Scheduling cannot be carried out typically occurs in the context of Advanced Planning and Optimization (APO) when there are issues related to the scheduling of production orders or planned orders. This error can arise due to various reasons, including:

    Causes:

    1. Missing Master Data: Required master data such as resources, production versions, or routing information may be missing or incorrectly configured.
    2. Capacity Constraints: The resources may be overloaded or not available during the required time frame, leading to scheduling conflicts.
    3. Incorrect Planning Parameters: The planning parameters set in the APO system may not align with the requirements of the production order.
    4. Order Status: The status of the order may not allow for scheduling (e.g., if the order is already completed or in a status that does not permit scheduling).
    5. Time Period Issues: The scheduling may be attempted outside of the defined planning horizon or time frame.
    6. Resource Availability: The resources required for the production process may not be available due to maintenance, holidays, or other scheduling conflicts.

    Solutions:

    1. Check Master Data: Ensure that all necessary master data (resources, production versions, routings) is correctly maintained and available in the system.
    2. Review Capacity Planning: Analyze the capacity of the resources involved and adjust the planning to ensure that there are no overloads or conflicts.
    3. Adjust Planning Parameters: Review and adjust the planning parameters in the APO system to ensure they are appropriate for the production orders being scheduled.
    4. Verify Order Status: Check the status of the production order or planned order to ensure it is in a state that allows for scheduling.
    5. Examine Time Periods: Ensure that the scheduling is being attempted within the defined planning horizon and that the time periods are correctly set.
    6. Resource Availability Check: Confirm that the required resources are available and not blocked by other orders or maintenance activities.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/SDP94 (for viewing the planning board) or /SAPAPO/MC90 (for checking capacity) to analyze the situation further.
    • Logs and Traces: Check the logs and traces in the APO system for more detailed error messages or warnings that can provide additional context for the issue.
    • SAP Notes: Look for relevant SAP Notes that may address specific issues related to this error message. SAP frequently updates its knowledge base with solutions for known issues.
    • Consult Documentation: Review the SAP documentation for APO to understand the scheduling process and any specific configurations that may be required.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant