How To Fix /SAPAPO/CIF512 - Requirement/receipt &1 for order &2: Different operation/phase assignment


/SAPAPO/CIF512 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CIF -

  • Message number: 512

  • Message text: Requirement/receipt &1 for order &2: Different operation/phase assignment

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CIF512 - Requirement/receipt &1 for order &2: Different operation/phase assignment ?
    The SAP error message /SAPAPO/CIF512 indicates that there is a mismatch in the operation or phase assignment between the requirement (such as a production order) and the receipt (such as a planned order or purchase order) in the SAP Advanced Planning and Optimization (APO) system. This error typically arises during the CIF (Core Interface) transfer between SAP ERP and SAP APO.
    
    Cause: The error can occur due to several reasons: Mismatch in Operation/Phase Assignment: The operation or phase assigned to the requirement does not match the operation or phase assigned to the receipt. This can happen if there are changes in the routing or if the order was modified after the initial assignment. Data Inconsistency: There may be inconsistencies in the master data between the ERP and APO systems, such as differences in the routing or production version.
    Configuration Issues: Incorrect configuration in the CIF settings or in the master data setup can lead to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker