Message type: E = Error
Message class: /SAPAPO/CIF -
Message number: 458
Message text: Order &1: Difference in requirements date (APO: &2 <-> R/3: &3)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CIF458
- Order &1: Difference in requirements date (APO: &2 <-> R/3: &3) ?The SAP error message /SAPAPO/CIF458 indicates a discrepancy in the requirements date between the Advanced Planning and Optimization (APO) system and the R/3 (now known as SAP ERP) system. Specifically, it highlights that the requirements date in APO (&2) is earlier than the requirements date in R/3 (&3) for a specific order (&1).
Cause: This error typically arises due to the following reasons: Data Synchronization Issues: There may be a delay or inconsistency in the data transfer between the APO and R/3 systems, leading to mismatched dates. Manual Changes: If someone manually changes the requirements date in one system without updating the other, it can lead to this error. Planning Parameters: Incorrect planning parameters or settings in either system can cause discrepancies in the calculated dates. Order Modifications: Changes made to the order in R/3 after it has been transferred to APO can result in this error if the changes are not reflected back in APO.
Solution: To
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CIF457
Order &1: Difference in schedule line number (APO: &2 <-> R/3: &3)
What causes this issue? Sales scheduling agreement item &V1& has a different schedule line number in SAP APO than in SAP R/3 (schedule line n...
/SAPAPO/CIF456
Order &1: Difference in SA release type (APO: &2 <-> R/3: &3)
What causes this issue? Sales scheduling agreement item &V1& has a different SA release type in SAP APO than in SAP R/3 (release type in SAP ...
/SAPAPO/CIF459
Order &1: Difference in date type (APO: &2 <-> R/3: &3)
What causes this issue? Sales scheduling agreement item &V1& has a different date type in SAP APO than in SAP R/3 (date type in SAP APO: &...
/SAPAPO/CIF460
Order &1: Difference in requirements quantity (APO: &2 <-> R/3: &3)
What causes this issue? Sales scheduling agreement item &V1& has a different requirements quantity in SAP APO than in SAP R/3 (requirements q...
Click on this link to search all SAP messages.