How To Fix /SAPAPO/CFM_MSG068 - Gap identified: expected start date &1 does not match the provided &2


/SAPAPO/CFM_MSG068 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CFM_MSG -

  • Message number: 068

  • Message text: Gap identified: expected start date &1 does not match the provided &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CFM_MSG068 - Gap identified: expected start date &1 does not match the provided &2 ?
    The SAP error message /SAPAPO/CFM_MSG068 indicates that there is a mismatch between the expected start date of a process or activity and the date that has been provided. This error typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly in the context of Capacity Planning or Production Planning.
    
    Cause: The error is caused by a discrepancy between the expected start date of a planned order, production order, or any other scheduling-related object and the date that is being provided in the system. This can happen due to several reasons, including: Incorrect Date Configuration: The system may have been configured with incorrect dates for the planning process. Changes in Planning Parameters: If planning parameters or settings have been changed after the initial planning run, it may lead to inconsistencies. Manual Adjustments: Manual changes to dates in the planning or scheduling process that do not align with the expected dates. Data Migration Issues: If

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author