How To Fix /SAPAPO/CFM_MSG030 - MT_RESULT is inconsistent


/SAPAPO/CFM_MSG030 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CFM_MSG -

  • Message number: 030

  • Message text: MT_RESULT is inconsistent

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/CFM_MSG030 - Details

  • The SAP error message /SAPAPO/CFM_MSG030 MT_RESULT is inconsistent typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Requirements Planning (CRP) or the Production Planning (PP) modules. This error indicates that there is an inconsistency in the results of a planning run, specifically related to the Multi-Threaded (MT) processing of results.
    Causes:
    
    Data Inconsistencies: There may be inconsistencies in the master data or transaction data, such as incorrect or missing data in the material master, production resources, or planning parameters.
    Planning Version Issues: The planning version being used may not be correctly set up or may have been changed after the planning run was initiated.
    Resource Availability: There may be issues with resource availability, such as capacity constraints or incorrect resource allocation.
    Configuration Errors: Incorrect configuration settings in the APO system can lead to inconsistencies in the planning results.
    Concurrency Issues: If multiple planning runs are executed simultaneously,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/CFM_MSG030 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker