How To Fix /SAPAPO/CDPSSFW044 - Availability dates adjusted for &1 receipts/requirements


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSSFW -

  • Message number: 044

  • Message text: Availability dates adjusted for &1 receipts/requirements

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSSFW044 - Availability dates adjusted for &1 receipts/requirements ?

    The SAP error message /SAPAPO/CDPSSFW044 Availability dates adjusted for &1 receipts/requirements typically occurs in the context of Advanced Planning and Optimization (APO) within SAP. This message indicates that the system has adjusted the availability dates for certain receipts or requirements due to various factors, such as changes in lead times, stock levels, or other planning parameters.

    Cause:

    1. Lead Time Changes: If the lead times for production or procurement have changed, the system may need to adjust the availability dates accordingly.
    2. Stock Levels: If there is insufficient stock to meet the demand, the system will adjust the availability dates to reflect when the stock will actually be available.
    3. Planning Parameters: Changes in planning parameters, such as safety stock levels, reorder points, or production schedules, can lead to adjustments in availability dates.
    4. Resource Constraints: If there are constraints on resources (e.g., machine availability, labor), the system may adjust the dates to reflect realistic production capabilities.
    5. Demand Changes: If there are changes in demand (e.g., increased sales orders), the system may need to adjust the availability dates to accommodate the new requirements.

    Solution:

    1. Review Planning Parameters: Check the planning parameters for the affected materials. Ensure that lead times, safety stock levels, and other relevant settings are correctly configured.
    2. Check Stock Levels: Verify the current stock levels and ensure that they are sufficient to meet the demand. If stock is low, consider adjusting procurement or production plans.
    3. Analyze Demand Changes: Look into any recent changes in demand that may have triggered the adjustment. If demand has increased, you may need to adjust your production or procurement plans accordingly.
    4. Resource Availability: Ensure that resources are available as planned. If there are constraints, consider rescheduling production or reallocating resources.
    5. Run the Planning Process Again: After making necessary adjustments, rerun the planning process to see if the availability dates can be aligned with the requirements.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/SDP94 (for viewing the planning board) or /SAPAPO/MC90 (for checking the planning book) to analyze the situation further.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation on APO and supply chain planning for more detailed information on how availability dates are calculated and adjusted.

    If the issue persists after taking these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in APO for further analysis and resolution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant