How To Fix /SAPAPO/CDPSSFW009 - Initializing scheduling framework completed successfully


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSSFW -

  • Message number: 009

  • Message text: Initializing scheduling framework completed successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSSFW009 - Initializing scheduling framework completed successfully ?

    The SAP error message /SAPAPO/CDPSSFW009 Initializing scheduling framework completed successfully is not actually an error message in the traditional sense. Instead, it is an informational message indicating that the initialization of the scheduling framework in SAP Advanced Planning and Optimization (APO) has been completed successfully.

    Cause:

    • This message is typically logged during the execution of a planning run or when the scheduling framework is being initialized. It indicates that the system has successfully set up the necessary components for scheduling tasks.

    Solution:

    Since this message is informational and does not indicate an error, there is no specific solution required. However, if you are experiencing issues with planning runs or scheduling in SAP APO, you may want to check the following:

    1. Check Logs: Review the logs for any subsequent error messages that may indicate a problem with the planning run or scheduling process.
    2. Monitor Performance: Ensure that the system performance is optimal, as delays or issues in the scheduling framework can affect planning runs.
    3. Configuration: Verify that the scheduling framework is correctly configured according to your business requirements.
    4. System Resources: Ensure that the system has adequate resources (CPU, memory, etc.) to handle the scheduling tasks.

    Related Information:

    • SAP APO: Advanced Planning and Optimization is a component of SAP that helps organizations with supply chain planning and optimization.
    • Scheduling Framework: This is a part of the APO that manages the scheduling of various planning tasks and processes.
    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO, such as /SAPAPO/SDP94 for planning book and /SAPAPO/OM17 for monitoring the scheduling framework.

    If you encounter any specific issues or errors following this message, it would be helpful to provide those details for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker