How To Fix /SAPAPO/CDPSSFW009 - Initializing scheduling framework completed successfully


/SAPAPO/CDPSSFW009 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSSFW -

  • Message number: 009

  • Message text: Initializing scheduling framework completed successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSSFW009 - Initializing scheduling framework completed successfully ?
    The SAP error message /SAPAPO/CDPSSFW009 Initializing scheduling framework completed successfully is not actually an error message in the traditional sense. Instead, it is an informational message indicating that the initialization of the scheduling framework in SAP Advanced Planning and Optimization (APO) has been completed successfully. 
    
    Cause: This message is typically logged during the execution of a planning run or when the scheduling framework is being initialized. It indicates that the system has successfully set up the necessary components for scheduling tasks.
    Solution: Since this message is informational and does not indicate an error, there is no specific solution required. However, if you are experiencing issues with planning runs or scheduling in SAP APO, you may want to check the following: Check Logs: Review the logs for any subsequent error messages that may indicate a problem with the planning run or scheduling process. Monitor Performance: Ensure that the system performance is optimal, as delays or issues

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author