How To Fix /SAPAPO/CDPSSFW006 - All activities were scheduled


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSSFW -

  • Message number: 006

  • Message text: All activities were scheduled

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSSFW006 - All activities were scheduled ?

    The SAP error message /SAPAPO/CDPSSFW006 All activities were scheduled typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning functionalities. This message indicates that the system has successfully scheduled all activities for a given planning run, but it may also imply that there are no further activities to be scheduled or that the scheduling process has reached its limits.

    Cause:

    1. All Activities Scheduled: The primary cause of this message is that the system has processed all the activities that were available for scheduling. This can happen if:

      • There are no new activities to schedule.
      • All activities have already been scheduled in a previous run.
      • The planning horizon has been reached, and there are no further activities within the defined time frame.
    2. Configuration Issues: Sometimes, the configuration settings in the APO system may lead to this message if the planning parameters are not set correctly.

    3. Data Issues: Missing or incorrect master data (like resources, production versions, etc.) can also lead to this message if the system cannot find any valid activities to schedule.

    Solution:

    1. Check Planning Data: Verify that there are indeed activities available for scheduling. This includes checking:

      • The planning horizon.
      • The availability of resources and production versions.
      • The demand and supply data to ensure there are activities to be scheduled.
    2. Review Configuration: Ensure that the configuration settings for the planning run are correct. This includes:

      • Checking the planning strategy.
      • Reviewing the settings for capacity planning and scheduling.
    3. Run a New Planning Run: If you believe there should be activities to schedule, try running a new planning run after ensuring that all necessary data is in place.

    4. Check Logs and Messages: Review the logs and messages generated during the planning run for any additional information that might indicate why no activities were scheduled.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its context.

    6. Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO, such as /SAPAPO/SDP94 for planning and scheduling.
    • SAP Notes: Check for any SAP Notes related to this error message for potential patches or updates that may address the issue.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed.

    By following these steps, you should be able to diagnose and resolve the issue related to the error message /SAPAPO/CDPSSFW006 All activities were scheduled.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages: