Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 861
Message text: Total delays: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT861
- Total delays: &1 ?The SAP error message
/SAPAPO/CDPSOPT861 Total delays: &1
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning functionalities. This error message indicates that there are total delays in the planning process, which can be caused by various factors.Causes:
- Capacity Constraints: The production resources may be overloaded, leading to delays in the planned production schedule.
- Material Shortages: Insufficient availability of materials can cause delays in production.
- Incorrect Master Data: Issues with master data such as incorrect lead times, production versions, or resource settings can lead to planning inconsistencies.
- Scheduling Conflicts: Overlapping production orders or scheduling conflicts can result in delays.
- Planning Parameters: Incorrect planning parameters or settings in the APO system can lead to inefficient planning and delays.
Solutions:
- Review Capacity Planning: Check the capacity of the resources involved in the planning process. Ensure that the resources are not overloaded and that they have sufficient capacity to meet the demand.
- Check Material Availability: Verify that all required materials are available for production. If there are shortages, consider adjusting the procurement or production plans.
- Validate Master Data: Review and correct any inaccuracies in the master data, including lead times, production versions, and resource settings.
- Adjust Scheduling: Look for scheduling conflicts and adjust the production orders to avoid overlaps. This may involve rescheduling some orders or changing the sequence of production.
- Optimize Planning Parameters: Review the planning parameters in the APO system to ensure they are set correctly for your production environment. Adjust them as necessary to improve planning efficiency.
- Run Heuristic or Optimization: If applicable, run the heuristic or optimization functions in APO to generate a new production plan that minimizes delays.
Related Information:
/SAPAPO/MC90
for planning book and /SAPAPO/CDPSOPT
for capacity planning.By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error message and improve the planning process in your SAP APO system.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT860
Maximum delay: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT859
Setup costs: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT862
Mode cost total: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT863
Storage costs: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.