Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 857
Message text: Lead time: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT857
- Lead time: &1 ?The SAP error message
/SAPAPO/CDPSOPT857 Lead time: &1
typically occurs in the context of Advanced Planning and Optimization (APO) within SAP systems. This error message indicates that there is an issue with the lead time configuration for a specific product or location in the system.Cause:
- Incorrect Lead Time Configuration: The lead time for the product/location may not be set correctly in the master data.
- Missing Data: The required data for calculating lead time may be missing or incomplete.
- Inconsistent Data: There may be inconsistencies in the data related to the product, such as conflicting lead time values in different planning books or data views.
- Planning Version Issues: The planning version being used may not have the correct lead time settings or data.
Solution:
- Check Master Data: Review the master data for the product in question. Ensure that the lead time is correctly defined in the material master or the relevant planning object.
- Update Lead Time: If the lead time is incorrect, update it in the relevant master data records (e.g., material master, location master).
- Data Consistency Check: Perform a consistency check on the data to identify any discrepancies or missing information that could be causing the error.
- Review Planning Version: Ensure that the planning version you are using has the correct lead time settings. If necessary, switch to a different version or update the current version.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on lead time settings and configurations in APO.
- Contact Support: If the issue persists after checking the above points, consider reaching out to SAP support or your internal SAP team for further assistance.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC62
(for master data) to access and modify the relevant data.By following these steps, you should be able to identify and resolve the issue related to the lead time error in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT856
Result of plan completion:
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT855
Result of campaign optimization:
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT858
Setup time: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT859
Setup costs: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.