Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 816
Message text: Backwards scheduling finished
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT816
- Backwards scheduling finished ?The SAP error message
/SAPAPO/CDPSOPT816
indicates that the backwards scheduling process has finished, but it may not have completed successfully or as expected. This message is typically related to the Advanced Planning and Optimization (APO) module in SAP, particularly in the context of production planning and scheduling.Cause:
- Scheduling Constraints: The scheduling process may have encountered constraints that prevented it from completing as intended. This could include resource availability, capacity issues, or conflicting orders.
- Data Issues: There may be missing or incorrect data in the master data (e.g., material master, resource master) or in the planning data (e.g., demand, supply).
- Configuration Settings: Incorrect configuration settings in the APO system can lead to issues during the scheduling process.
- Planning Version: The planning version being used may not be set up correctly or may not have the necessary data for scheduling.
Solution:
- Check Logs: Review the detailed logs for the scheduling run to identify any specific errors or warnings that may provide more context on what went wrong.
- Validate Data: Ensure that all relevant master data and planning data are complete and accurate. Check for any missing or incorrect entries.
- Review Constraints: Analyze the constraints that may be affecting the scheduling process. This includes checking resource availability, capacity, and any other scheduling parameters.
- Configuration Review: Verify the configuration settings in the APO system to ensure they are set up correctly for the scheduling process.
- Planning Version: Make sure that the correct planning version is being used and that it contains all necessary data for the scheduling run.
- Re-run Scheduling: After addressing any identified issues, re-run the backwards scheduling process to see if the problem persists.
Related Information:
/SAPAPO/CDPSOPT
to access the scheduling options and settings.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT815
Backwards scheduling started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT814
Log is being created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT817
Campaign optimization started
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT818
Campaign optimization finished
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.