Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 758
Message text: Planned delivery time for order &1 not reached
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT758
- Planned delivery time for order &1 not reached ?The SAP error message
/SAPAPO/CDPSOPT758 Planned delivery time for order &1 not reached
typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to meet the planned delivery time for a specific order. This can happen for various reasons, including issues with supply chain constraints, production delays, or incorrect planning parameters.Causes:
- Supply Chain Constraints: There may be constraints in the supply chain, such as limited production capacity, insufficient inventory, or delays in procurement.
- Incorrect Planning Parameters: The planning parameters set in the system may not align with the actual production or delivery capabilities.
- Production Delays: If there are delays in production processes, it can lead to the planned delivery time not being met.
- Transportation Issues: Delays in transportation or logistics can also contribute to this error.
- Order Prioritization: If there are higher-priority orders that are consuming resources, it may delay the fulfillment of the order in question.
Solutions:
- Review Planning Parameters: Check the planning parameters for the order and ensure they are set correctly. This includes lead times, safety stock levels, and production capacities.
- Check Supply Chain Status: Analyze the supply chain for any bottlenecks or constraints that may be affecting the order. This includes checking inventory levels, production schedules, and supplier performance.
- Adjust Production Schedule: If production delays are identified, consider adjusting the production schedule to prioritize the order in question.
- Enhance Communication with Suppliers: If procurement delays are an issue, improve communication with suppliers to ensure timely delivery of materials.
- Use APO Tools: Utilize APO tools such as the Supply Network Planning (SNP) or Production Planning and Detailed Scheduling (PP/DS) to optimize the planning process and resolve any issues.
- Monitor Transportation: If transportation is a factor, work with logistics providers to ensure timely delivery and consider alternative transportation options if necessary.
Related Information:
/SAPAPO/SDP94
(for viewing the order) or /SAPAPO/SDP94
(for planning board) to analyze the order and its status.By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error and improve the planning process in your SAP APO environment.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT757
All activities are fixed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT756
Mode linkage for order &1 cannot be processed
Change the optimization profile if necessary.Procedure for System Administrators linkage. Start-Start without minimum and maximum time variances wit...
/SAPAPO/CDPSOPT759
Order &1 cannot be scheduled on time
What causes this issue? A latest start or end date has been predefined for order &V1& either at the order itself or indirectly due to one of ...
/SAPAPO/CDPSOPT777
Available memory on optimization server is low (available: &1%)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.