Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 749
Message text: There is a possible overload of resource capacity &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT749
- There is a possible overload of resource capacity &1 ?The SAP error message
/SAPAPO/CDPSOPT749
indicates that there is a potential overload of resource capacity in the Advanced Planning and Optimization (APO) module. This typically occurs during planning runs when the demand exceeds the available capacity of a resource, leading to a situation where the system cannot fulfill the planned production or service levels.Cause:
- Demand Exceeds Capacity: The most common cause is that the planned demand for a product exceeds the available capacity of the resources (e.g., machines, labor) required to produce it.
- Incorrect Capacity Settings: The capacity settings for the resources may not be configured correctly, leading to an underestimation of available capacity.
- Resource Allocation Issues: There may be issues with how resources are allocated across different production orders or planning scenarios.
- Changes in Demand or Supply: Sudden changes in demand or supply chain disruptions can lead to unexpected overloads.
- Planning Parameters: Incorrect planning parameters or settings in the APO system can also contribute to this issue.
Solution:
- Review Capacity Planning: Check the capacity planning settings for the affected resources. Ensure that the available capacity is correctly defined and reflects the actual capabilities of the resources.
- Adjust Demand: If possible, adjust the planned demand to align with the available capacity. This may involve rescheduling orders or reducing demand forecasts.
- Increase Resource Capacity: If feasible, consider increasing the capacity of the resources by adding shifts, overtime, or additional resources.
- Reallocate Resources: Review the allocation of resources across different production orders and adjust as necessary to balance the load.
- Use Planning Tools: Utilize APO planning tools to simulate different scenarios and find an optimal solution that balances demand and capacity.
- Check for Errors in Master Data: Ensure that the master data for resources, products, and demand is accurate and up to date. Incorrect data can lead to planning errors.
- Consult Documentation: Refer to SAP documentation or support notes related to this error message for additional insights and troubleshooting steps.
Related Information:
/SAPAPO/CC01
(Capacity Check) or /SAPAPO/MC90
(Capacity Planning) to analyze capacity issues.By following these steps, you should be able to identify the root cause of the overload and implement a suitable solution to resolve the error.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT748
Capacity of resource &1 changed to zero
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT733
Critical Activity &3 %: Order &1 on &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT750
Propagator: Internal problem with time relationship &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT752
Activity &1 at resource &2: Constraint without capacity requirement
What causes this issue? There are constraints for activity &V1& at resource &V2& that do not require a capacity at resource &V2&a...
Click on this link to search all SAP messages.