How To Fix /SAPAPO/CDPSOPT700 - Resource capacity is too high


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 700

  • Message text: Resource capacity is too high

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT700 - Resource capacity is too high ?

    The SAP error message /SAPAPO/CDPSOPT700 Resource capacity is too high typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with capacity planning and scheduling. This error indicates that the planned capacity for a resource exceeds its defined limits, which can lead to infeasibility in the production or planning process.

    Cause:

    1. Excessive Demand: The planned demand for a product may exceed the available capacity of the resource.
    2. Incorrect Capacity Settings: The resource's capacity settings may not be configured correctly, leading to an underestimation of available capacity.
    3. Resource Allocation: Multiple orders or production runs may be scheduled simultaneously on the same resource, causing a capacity overload.
    4. Planning Parameters: Incorrect planning parameters or settings in the APO system can lead to unrealistic capacity requirements.
    5. Changes in Demand or Supply: Sudden changes in demand or supply can lead to capacity issues if not properly accounted for in the planning process.

    Solution:

    1. Review Resource Capacity: Check the capacity settings for the resource in question. Ensure that the available capacity is correctly defined in the system.
    2. Adjust Demand: If possible, adjust the planned demand to align with the available capacity. This may involve rescheduling orders or reducing production quantities.
    3. Reallocate Resources: If multiple orders are scheduled on the same resource, consider redistributing the workload across different resources to balance the capacity.
    4. Modify Planning Parameters: Review and adjust the planning parameters in the APO system to ensure they reflect realistic production capabilities.
    5. Capacity Planning: Use capacity planning tools within SAP APO to analyze and optimize resource utilization. This may involve creating capacity profiles or using heuristics to better allocate resources.
    6. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on capacity planning and error resolution.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP APO, such as /SAPAPO/CCP for capacity planning and /SAPAPO/CDPS for detailed scheduling.
    • Capacity Planning Reports: Utilize reports and analytics tools within SAP APO to monitor resource utilization and identify potential bottlenecks.
    • User Exits and BAdIs: If custom logic is required, consider implementing user exits or Business Add-Ins (BAdIs) to enhance capacity planning functionality.
    • SAP Notes: Check for any relevant SAP Notes that may address known issues or provide patches related to capacity planning errors.

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve the capacity issue in your SAP APO environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant