How To Fix /SAPAPO/CDPSOPT510 - Maximum runtime


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 510

  • Message text: Maximum runtime

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT510 - Maximum runtime ?

    The SAP error message /SAPAPO/CDPSOPT510 Maximum runtime typically occurs in the context of SAP Advanced Planning and Optimization (APO) when a planning run exceeds the predefined maximum runtime limit. This can happen during various planning processes, such as heuristic runs, optimization runs, or other planning activities.

    Cause:

    1. Complexity of the Planning Problem: The planning problem may be too complex, involving a large number of products, locations, or constraints, which can lead to longer processing times.
    2. Insufficient System Resources: The system may not have enough CPU or memory resources allocated to handle the planning task efficiently.
    3. Inefficient Planning Settings: The settings for the planning run may not be optimized, leading to longer execution times.
    4. Data Volume: A large volume of data being processed can also contribute to longer runtimes.
    5. Configuration Issues: Incorrect configuration of the planning area or planning books can lead to inefficiencies.

    Solution:

    1. Increase Maximum Runtime: You can increase the maximum runtime limit for the planning run. This can be done in the configuration settings of the planning run. However, this is a temporary solution and may not address the underlying issues.
    2. Optimize Planning Settings: Review and optimize the settings for the planning run. This may include adjusting heuristics, reducing the number of products or locations being processed, or simplifying constraints.
    3. Improve System Resources: Ensure that the system has adequate resources (CPU, memory) to handle the planning tasks. This may involve hardware upgrades or optimizing the system configuration.
    4. Data Management: Consider reducing the volume of data being processed in a single run. This can be done by breaking down the planning tasks into smaller, more manageable chunks.
    5. Review and Optimize Data Models: Ensure that the data models and planning books are configured correctly and efficiently. This may involve reviewing key figures, planning levels, and other settings.
    6. Run in Background: If the planning run is taking too long, consider running it in the background to avoid timeouts and allow it to complete without interruption.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/CDPSOPT to access the optimization settings or /SAPAPO/SDP94 for planning board settings.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message or provide patches and updates.
    • Performance Monitoring: Use performance monitoring tools to analyze the execution time and resource usage of the planning runs to identify bottlenecks.
    • Consult Documentation: Refer to SAP documentation for best practices in configuring and optimizing APO planning runs.

    If the issue persists after trying the above solutions, it may be beneficial to consult with SAP support or a technical consultant who specializes in SAP APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker