Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 364
Message text: Resource &1: Too many material receipts
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT364
- Resource &1: Too many material receipts ?The SAP error message
/SAPAPO/CDPSOPT364 Resource &1: Too many material receipts
typically occurs in the context of Advanced Planning and Optimization (APO) when there are too many material receipts scheduled for a specific resource. This can lead to inefficiencies in production planning and scheduling.Cause:
Excessive Receipts: The error indicates that the number of material receipts (incoming materials) scheduled for a particular resource exceeds the system's predefined limits. This can happen due to:
- High demand for materials.
- Inefficient planning or scheduling practices.
- Incorrect configuration of the resource or planning parameters.
Resource Configuration: The resource may have been configured with limits on the number of receipts it can handle within a certain timeframe.
Planning Strategy: The planning strategy used may not be suitable for the current demand and supply situation, leading to an overload of receipts.
Solution:
Review and Adjust Planning Parameters:
- Check the configuration of the resource in the APO system. Look for settings related to the maximum number of receipts allowed.
- Adjust the planning parameters to allow for more receipts if necessary.
Optimize Production Schedule:
- Analyze the production schedule to identify bottlenecks or inefficiencies.
- Consider redistributing the demand across different resources or time periods to reduce the number of receipts for the affected resource.
Modify Demand Management:
- Review the demand management process to ensure that it aligns with the production capabilities.
- Implement better forecasting techniques to avoid sudden spikes in demand that lead to excessive receipts.
Use Heuristics or Optimization:
- Utilize APO heuristics or optimization tools to generate a more balanced production plan that minimizes the number of material receipts.
Consult SAP Documentation:
- Refer to SAP documentation or support notes for specific guidance on handling this error message and for best practices in resource planning.
Related Information:
/SAPAPO/MC90
(for planning book) or /SAPAPO/SDP94
(for demand planning) to analyze the situation further.By addressing the underlying causes and optimizing the planning process, you can resolve the error and improve the efficiency of your production planning in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT363
Resource &1: Fill level change will be added
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT362
Resource &1: Storage characteristic can not be considered
What causes this issue? An unsolvable situation occurs at resource <(>&<)>V1& due to materials being added and withdrawn, and mea...
/SAPAPO/CDPSOPT365
Resource &1: Too few material receipts
What causes this issue? The minimum permitted fill level at resource <(>&<)>V1& has been unavoidably violated within the optimiza...
/SAPAPO/CDPSOPT366
Resource &1: Storage property causes unsolvable problems
What causes this issue? While considering the specified times and relaxation of capacity constraints, the optimizer has determined that there is eith...
Click on this link to search all SAP messages.