Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 361
Message text: Resource &1: Initial load is outside of the capacity range
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT361
- Resource &1: Initial load is outside of the capacity range ?The SAP error message
/SAPAPO/CDPSOPT361 Resource &1: Initial load is outside of the capacity range
typically occurs in the context of Advanced Planning and Optimization (APO) when the initial load for a resource exceeds its defined capacity limits. This can happen during planning runs, such as when you are trying to schedule production or transportation activities.Cause:
- Capacity Limits: The resource in question has defined capacity limits (e.g., maximum available capacity per time period), and the initial load (the amount of work or production scheduled) exceeds these limits.
- Incorrect Configuration: The resource may not be configured correctly in terms of its capacity settings, leading to discrepancies between the planned load and the actual capacity.
- Planning Parameters: The planning parameters or settings may not align with the actual operational capabilities of the resource.
- Data Issues: There may be issues with the data being used for planning, such as incorrect demand forecasts or production orders that are not aligned with capacity.
Solution:
- Review Resource Capacity: Check the capacity settings for the resource in question. Ensure that the defined capacity is sufficient to handle the initial load. You can do this in the APO system under the resource master data.
- Adjust Initial Load: If the initial load is indeed too high, consider adjusting the planned orders or production schedules to fit within the resource's capacity limits.
- Modify Planning Parameters: Review and adjust the planning parameters to ensure they reflect the actual capabilities of the resource.
- Check for Data Consistency: Ensure that all relevant data (such as demand forecasts, production orders, and resource availability) is accurate and consistent.
- Capacity Planning: If necessary, consider implementing capacity planning strategies to better align production schedules with available resources.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on capacity planning and resource management in APO.
Related Information:
/SAPAPO/RESC
to view and manage resource capacities.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT360
Resource &1: Undefined initial load
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT359
&1: Order &2 generates capacity overload
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT362
Resource &1: Storage characteristic can not be considered
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT363
Resource &1: Fill level change will be added
What causes this issue? An unsolvable situation has occurred at resource <(>&<)>V1& due to materials being added and withdrawn, a...
Click on this link to search all SAP messages.