Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 358
Message text: Constraint &1 for resource &2 cannot be evaluated
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT358
- Constraint &1 for resource &2 cannot be evaluated ?The SAP error message /SAPAPO/CDPSOPT358 Constraint &1 for resource &2 cannot be evaluated typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning modules. This error indicates that there is an issue with evaluating a specific constraint related to a resource during the planning process. Causes: Invalid Constraint Definition: The constraint specified may not be defined correctly or may not exist in the system. Resource
Configuration Issues: The resource in question may not be properly configured, or there may be missing parameters that prevent the evaluation of the constraint. Data Inconsistencies: There may be inconsistencies in the master data or transaction data related to the resource or the constraints. Planning Version Issues: The planning version being used may not have the necessary data or settings to evaluate the constraint. Locking Issues: The resource might be locked by another process, preventing the evaluation of constraints. Solutions: Check
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT353
Resource &1 is not a single resource
The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Procedure for System Adminis...
/SAPAPO/CDPSOPT352
Campaign optimization: Only one activity/locked activity chain per order
What causes this issue? For campaign optimization, order &V1& is only permitted to contain one activity or <DS:GLOS.34FC8091B6F6D311A49100...
/SAPAPO/CDPSOPT359
&1: Order &2 generates capacity overload
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT360
Resource &1: Undefined initial load
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.