How To Fix /SAPAPO/CDPSOPT311 - &1: Activity has multiple predecessors in locked activity chain


/SAPAPO/CDPSOPT311 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 311

  • Message text: &1: Activity has multiple predecessors in locked activity chain

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT311 - &1: Activity has multiple predecessors in locked activity chain ?
    The SAP error message /SAPAPO/CDPSOPT311 &1: Activity has multiple predecessors in locked activity chain typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning modules. This error indicates that the system has detected an issue with the activity chain where an activity has more than one predecessor, which is not allowed in certain scenarios.
    
    Cause: Multiple Predecessors: The primary cause of this error is that the activity in question has been defined with multiple predecessor activities, which can lead to ambiguity in scheduling and resource allocation. Locked Activity Chain: The error also suggests that the activity chain is locked, meaning that it is currently being processed or modified by another transaction or user, preventing changes to its structure.
    Configuration Issues: There may be configuration issues in the planning setup that allow for multiple predecessors where only one is expected.
    Solution: Check Activity Definition: Review

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker