Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 305
Message text: Mode &1 of activity &2 has no primary resource
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT305
- Mode &1 of activity &2 has no primary resource ?The SAP error message
/SAPAPO/CDPSOPT305
indicates that a specific mode of an activity does not have a primary resource assigned to it. This error typically occurs in the context of Advanced Planning and Optimization (APO) when trying to perform planning activities that require resource allocation.Cause:
- Missing Primary Resource: The mode of the activity specified in the error message does not have a primary resource defined. This can happen if the resource configuration is incomplete or if the resource was deleted or not properly assigned.
- Incorrect Activity Configuration: The activity may not be set up correctly in the system, leading to the absence of a primary resource.
- Planning Version Issues: The planning version being used may not have the necessary resource assignments or configurations.
Solution:
Check Resource Assignment:
- Go to the resource master data in the SAP APO system.
- Verify that the mode of the activity has a primary resource assigned. If not, assign a primary resource to the mode.
Review Activity Configuration:
- Navigate to the activity configuration in the APO system.
- Ensure that the activity is correctly set up and that all required modes have the necessary resources assigned.
Update Planning Version:
- If you are using a specific planning version, check if the version has the correct resource assignments.
- If necessary, update the planning version to include the required resources.
Check for Deletions:
- Ensure that the resource has not been deleted or made inactive. If it has, you may need to reactivate it or create a new resource.
Consult Documentation:
- Review SAP documentation or help resources for additional guidance on configuring resources and activities in APO.
Testing:
- After making the necessary changes, re-run the planning process to see if the error persists.
Related Information:
/SAPAPO/RRP3
(Product View) or /SAPAPO/RES01
(Resource Overview) to check resource assignments and configurations.By following these steps, you should be able to resolve the error message /SAPAPO/CDPSOPT305
and ensure that your planning activities can proceed without issues.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT304
Fixed setup activity &1 is not supported
What causes this issue? Setup activity &V1& is fixed.System Response The optimizer does not support fixed setup activities. The system there...
/SAPAPO/CDPSOPT303
Invalid relationship between two activities has been deleted
What causes this issue? The link between production activities &V1& and &V2& is inconsistent with the model.System Response In order...
/SAPAPO/CDPSOPT306
Activity &1 refers to a primary resource &2 with no re-setup
What causes this issue? Mode &V3& of activity &V1& refers to resource &V2&. No matrix is assigned to this resource. However, ...
/SAPAPO/CDPSOPT307
Setup activity &1 cannot setup resource &2
What causes this issue? Mode &V3& of activity &V1& describes how to set up resource &V2&. However, this resource does not hav...