How To Fix /SAPAPO/CDPSOPT302 - Invalid rel. between setup activity and production act. has been deleted


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 302

  • Message text: Invalid rel. between setup activity and production act. has been deleted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT302 - Invalid rel. between setup activity and production act. has been deleted ?

    The SAP error message /SAPAPO/CDPSOPT302 indicates that there is an invalid relationship between a setup activity and a production activity in the context of SAP Advanced Planning and Optimization (APO). This error typically arises when the system detects that a setup activity, which is necessary for a production activity to occur, has been deleted or is no longer valid.

    Cause:

    1. Deleted Setup Activity: The setup activity that was previously linked to a production activity has been deleted from the system.
    2. Inconsistent Data: There may be inconsistencies in the data related to production planning, such as changes in the production process or configuration.
    3. Configuration Changes: Changes in the configuration of the production process or the master data (like resources, production versions, etc.) can lead to this error.
    4. Data Migration Issues: If data was migrated from another system or during an upgrade, relationships may not have been correctly established.

    Solution:

    1. Check Setup Activities: Verify if the setup activity that is causing the error still exists in the system. If it has been deleted, you may need to recreate it or adjust the production activity to remove the dependency.
    2. Review Production Activities: Look at the production activities linked to the setup activity. Ensure that they are correctly configured and that all necessary relationships are intact.
    3. Re-establish Relationships: If the setup activity is still valid but was incorrectly linked, you may need to re-establish the relationship between the setup and production activities.
    4. Data Consistency Check: Run consistency checks in the APO system to identify and resolve any inconsistencies in the master data or planning data.
    5. Consult Documentation: Review SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.
    6. Contact SAP Support: If the issue persists and you cannot resolve it, consider reaching out to SAP support for assistance.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/CDPSOPT to analyze the setup and production activities.
    • Master Data: Ensure that the master data for resources, production versions, and setup activities is correctly maintained.
    • SAP Notes: Check for any relevant SAP Notes that may provide additional insights or solutions for this specific error message.
    • Testing: After making changes, conduct thorough testing to ensure that the production planning process works as expected without any further errors.

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.