How To Fix /SAPAPO/CDPSOPT290 - Activity &1: Only a finish-start time relatnshp to setup activity allowed


/SAPAPO/CDPSOPT290 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 290

  • Message text: Activity &1: Only a finish-start time relatnshp to setup activity allowed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT290 - Activity &1: Only a finish-start time relatnshp to setup activity allowed ?
    The SAP error message /SAPAPO/CDPSOPT290 indicates that there is an issue with the scheduling of activities in the SAP Advanced Planning and Optimization (APO) module, specifically related to the setup activities. The message states that only a finish-start relationship is allowed for the setup activity in question.
    
    Cause: This error typically arises when: Incorrect Relationship Type: The scheduling relationship between activities is not set up correctly. In this case, the system expects a finish-start relationship for setup activities, meaning that the setup must be completed before the next activity can start.
    Configuration Issues: There may be configuration settings in the APO system that do not align with the requirements for scheduling setup activities. Data Entry Errors: There could be errors in the data entry for the activities, such as incorrect start or finish times or relationships that do not conform to the expected model.
    Solution: To resolve this error, you can take the following steps: Check Activity Relationships: Go

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author