Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 250
Message text: Error in context data consistency rule &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT250
- Error in context data consistency rule &1 ?The SAP error message
/SAPAPO/CDPSOPT250
indicates that there is an issue with the context data consistency rule in the Advanced Planning and Optimization (APO) module. This error typically arises during the planning process when the system detects inconsistencies in the data that is being processed.Cause:
The error can be caused by several factors, including:
- Inconsistent Master Data: There may be discrepancies in the master data (e.g., material master, location master) that are being used in the planning run.
- Incorrect Planning Parameters: The planning parameters or settings may not be correctly configured, leading to inconsistencies.
- Data Locking Issues: If multiple users or processes are trying to access or modify the same data simultaneously, it can lead to inconsistencies.
- Custom Code or Enhancements: If there are custom developments or enhancements in the APO system, they may not be handling data correctly, leading to this error.
- Data Transfer Issues: Problems during data transfer from SAP ERP to SAP APO can also lead to inconsistencies.
Solution:
To resolve the error, you can take the following steps:
- Check Master Data: Verify the consistency of the master data involved in the planning process. Ensure that all relevant data (materials, locations, etc.) is correctly maintained and consistent.
- Review Planning Parameters: Check the planning parameters and settings in the APO system to ensure they are configured correctly.
- Analyze Logs: Look at the logs for more detailed information about the error. This can provide insights into what specific data or process is causing the issue.
- Data Consistency Check: Use transaction codes like
/SAPAPO/SDP94
or/SAPAPO/CDPSOPT
to perform consistency checks on the data.- Locking Issues: Ensure that there are no locking issues by checking if other users or processes are accessing the same data.
- Custom Code Review: If there are custom developments, review the code to ensure it is functioning as expected and not causing inconsistencies.
- Re-run Planning: After addressing the issues, re-run the planning process to see if the error persists.
Related Information:
If the problem persists after trying the above solutions, it may be necessary to involve SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT248
No relationship defined between act. &1 and setup act. &2
What causes this issue? A relationship between an activity and its setup activity must be defined and the resource network flag must be set.System Re...
/SAPAPO/CDPSOPT247
Order &1: Requirements/avail.date &2 lies before optimization horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT251
Activity &1 does not have a mode that can be selected
What causes this issue? There are no available modes for activity &V1& for the optimizer to use in scheduling this activity.System Response ...
/SAPAPO/CDPSOPT252
Value range for activity or mode &1 is not valid
What causes this issue? The modes of an activity have value ranges that the optimizer cannot process. Examples: The shortest possible duration for an...
Click on this link to search all SAP messages.