How To Fix /SAPAPO/CDPSOPT245 - Activity &1: Requirements/avail. date &2 lies before optimization horizon


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 245

  • Message text: Activity &1: Requirements/avail. date &2 lies before optimization horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT245 - Activity &1: Requirements/avail. date &2 lies before optimization horizon ?

    The SAP error message /SAPAPO/CDPSOPT245 indicates that there is an issue with the scheduling of activities in the Advanced Planning and Optimization (APO) module. Specifically, the error states that the requirements or availability date for a particular activity lies before the optimization horizon defined in the system. This means that the system is unable to process the activity because it is scheduled to occur before the time frame that has been set for optimization.

    Cause:

    1. Optimization Horizon: The optimization horizon is a defined period within which the system is allowed to perform planning and scheduling. If a requirement or availability date falls outside this horizon (specifically before it), the system will raise this error.
    2. Incorrect Data Entry: There may be incorrect or outdated data in the planning books or master data that leads to scheduling conflicts.
    3. Configuration Issues: The configuration settings for the planning area or the optimization profile may not be set correctly, leading to discrepancies in the scheduling logic.

    Solution:

    1. Adjust the Optimization Horizon:

      • Review and, if necessary, extend the optimization horizon in the configuration settings. This can be done in the APO system under the relevant planning area settings.
      • Navigate to the configuration settings for the planning area and adjust the optimization horizon to include the required dates.
    2. Check Requirement Dates:

      • Review the requirement dates for the activity in question. Ensure that they are set correctly and fall within the defined optimization horizon.
      • If the requirement date is incorrect, update it to a date that falls within the optimization horizon.
    3. Review Master Data:

      • Check the master data related to the product, location, or resource involved in the activity. Ensure that all relevant data is accurate and up to date.
      • Look for any inconsistencies or outdated information that may be causing the scheduling issue.
    4. Run Planning Again:

      • After making the necessary adjustments, re-run the planning process to see if the error persists.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for more detailed guidance on managing optimization horizons and scheduling in APO.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/SDP94 (for planning book) or /SAPAPO/CDPSOPT (for optimization settings) to access relevant settings.
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may resolve the issue.
    • User Forums: Consider visiting SAP community forums or user groups where similar issues may have been discussed, providing additional context or solutions.

    By following these steps, you should be able to resolve the error and ensure that your planning activities are scheduled correctly within the defined optimization horizon.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant