How To Fix /SAPAPO/CDPSOPT214 - Activity &1 has multiple direct predecessors


/SAPAPO/CDPSOPT214 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/CDPSOPT -

  • Message number: 214

  • Message text: Activity &1 has multiple direct predecessors

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/CDPSOPT214 - Activity &1 has multiple direct predecessors ?
    The SAP error message /SAPAPO/CDPSOPT214 Activity &1 has multiple direct predecessors typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the scheduling of activities in a project or production planning scenario. This error indicates that the specified activity has more than one direct predecessor, which can create ambiguity in the scheduling process.
    
    Cause: Multiple Predecessors: The activity in question is set up in such a way that it has more than one predecessor that directly leads into it. In project management and scheduling, an activity can only have one direct predecessor to maintain a clear sequence of operations. Incorrect Configuration: The configuration of the activities in the project or production planning might not be set up correctly, leading to multiple predecessors being assigned to a single activity. Data Integrity Issues: There may be issues with the data integrity in the planning model, such as incorrect links between

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author