Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 211
Message text: Invalid calendar &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT211
- Invalid calendar &1 ?The SAP error message
/SAPAPO/CDPSOPT211 Invalid calendar &1
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the calendar configuration used in planning processes. This error indicates that the system is unable to recognize or find the specified calendar, which is essential for scheduling and planning activities.Cause:
- Invalid Calendar ID: The calendar ID specified in the planning run or configuration does not exist in the system.
- Calendar Not Assigned: The calendar may not be assigned to the relevant planning object or location.
- Configuration Issues: There may be issues with the configuration of the calendar in the APO system.
- Transport Issues: If the calendar was recently transported from another system, it may not have been properly imported or activated.
Solution:
- Check Calendar ID: Verify that the calendar ID specified in the error message is correct. You can do this by navigating to the relevant configuration settings in SAP APO.
- Create or Activate Calendar: If the calendar does not exist, you may need to create it. If it exists but is inactive, ensure it is activated.
- Assign Calendar: Ensure that the calendar is properly assigned to the relevant planning object (e.g., location, product, etc.). This can be done in the master data settings.
- Review Configuration: Check the configuration settings in the SAP APO system to ensure that the calendar is set up correctly.
- Transport Check: If the calendar was recently transported, check the transport logs for any errors and ensure that all necessary objects were transported correctly.
Related Information:
/SAPAPO/MC62
to view and manage calendars in SAP APO.If the problem persists after following these steps, it may be beneficial to consult with your SAP Basis or APO support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT210
Invalid definition of a constraint at resource &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT209
Invalid definition of a time relationship between &1 and &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT212
&1: Invalid calendar
What causes this issue? The calendar for resource &V1& has areas outside of the valid value range. Example: A single-activity resource cannot...
/SAPAPO/CDPSOPT213
Activity &1 has multiple direct successors
What causes this issue? Activity &V1& is linked more than once to a following activity.How to fix this error? Check the activity links in th...
Click on this link to search all SAP messages.