Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 206
Message text: Runtime chosen too short
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT206
- Runtime chosen too short ?The SAP error message
/SAPAPO/CDPSOPT206 Runtime chosen too short
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Capacity Planning or Production Planning functionalities. This error indicates that the runtime specified for a planning run is shorter than what is required for the operations or processes being executed.Cause:
- Insufficient Runtime: The runtime defined for the planning run is not sufficient to complete the required calculations or processes. This can happen if the planning horizon is too short or if the operations require more time than allocated.
- Configuration Issues: There may be configuration settings in the planning area or in the planning run parameters that do not align with the actual requirements of the production or planning processes.
- Data Issues: Inconsistent or incomplete data in the master data (like production versions, resources, etc.) can lead to unexpected runtime requirements.
Solution:
- Increase Runtime: Review the planning run parameters and increase the runtime to accommodate the necessary calculations. This can be done in the transaction where the planning run is initiated.
- Check Planning Area Settings: Ensure that the planning area settings are correctly configured. This includes checking the time buckets and the overall planning horizon.
- Review Master Data: Verify that all relevant master data (like resources, production versions, etc.) is complete and correctly configured. Incomplete or incorrect data can lead to runtime issues.
- Analyze the Planning Run: Use transaction codes like
/SAPAPO/CDPSOPT
to analyze the planning run and identify any specific operations or processes that are causing the runtime to exceed the defined limits.- Consult Documentation: Refer to SAP documentation or notes related to the specific version of APO you are using for any known issues or additional configuration settings that may be required.
Related Information:
/SAPAPO/CDPSOPT
for planning runs and /SAPAPO/MC90
for checking planning area settings.If the problem persists after trying the above solutions, it may be beneficial to consult with your SAP Basis or APO support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT205
Runtime chosen is possibly too short
What causes this issue? The system could not find a solution for the optimization problem during the specified runtime.System Response The system is...
/SAPAPO/CDPSOPT204
&1: Not available
What causes this issue? Resource &V1& is not available.System Response Optimization is unable to plan on the resource.How to fix this error?...
/SAPAPO/CDPSOPT207
Backward scheduling does not require the entire runtime specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT208
Invalid amount of resource constraints for resource &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.