Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 100
Message text: Not enough memory
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT100
- Not enough memory ?The SAP error message
/SAPAPO/CDPSOPT100 Not enough memory
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when the system runs out of memory while trying to execute a planning run or optimization task. This can happen due to various reasons, including large data volumes, inefficient memory allocation, or system configuration issues.Causes:
- Large Data Volume: The planning run may involve a large amount of data that exceeds the available memory.
- Insufficient Memory Allocation: The SAP system may not have enough memory allocated to handle the optimization task.
- Inefficient Queries: Poorly designed queries or planning models that require excessive memory.
- System Configuration: The SAP system may not be optimally configured for the workload it is handling.
- Background Jobs: Other background jobs running simultaneously may consume memory resources.
Solutions:
Increase Memory Allocation:
- Adjust the memory settings in the SAP profile parameters. You can increase the
abap/heap_area_total
andabap/heap_area_dia
parameters to allocate more memory for ABAP programs.- Consider increasing the
rdisp/PG_MAXFS
parameter to allow for larger memory allocation for the dispatcher.Optimize Data Volume:
- Reduce the amount of data being processed in a single planning run. This can be done by filtering data or breaking down the planning run into smaller segments.
- Archive old or unnecessary data to free up memory.
Review and Optimize Queries:
- Analyze and optimize the queries used in the planning run to ensure they are efficient and do not consume excessive memory.
Check System Configuration:
- Review the overall system configuration and ensure that it is optimized for the workload. This may involve consulting with your SAP Basis team.
Monitor Background Jobs:
- Check for other background jobs that may be consuming memory and consider scheduling them at different times to reduce memory contention.
Use SAP Notes:
- Check for any relevant SAP Notes that may address this specific error or provide patches that improve memory management in APO.
Upgrade Hardware:
- If the issue persists and is due to hardware limitations, consider upgrading the server's RAM or moving to a more powerful server.
Related Information:
By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the /SAPAPO/CDPSOPT100 Not enough memory
error effectively.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSOPT099
Calling &1 for not supported application &2, only supporting &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT060
Optimizer and COM Object are not compatible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT101
Resource &1 does not have a calendar
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSOPT102
Resource &1 is unknown
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.