Message type: E = Error
Message class: /SAPAPO/CDPSOPT -
Message number: 024
Message text: The start horizon should be before the end horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSOPT024
- The start horizon should be before the end horizon ?The SAP error message /SAPAPO/CDPSOPT024 indicates that there is an issue with the planning horizons defined in your SAP Advanced Planning and Optimization (APO) system. Specifically, the error states that the "start horizon should be before the end horizon." This typically occurs when the planning start date is set to a date that is later than the planning end date, which is logically incorrect.
Cause: Incorrect Date Configuration: The start date for the planning horizon is set after the end date. Data Entry Error: During the configuration of planning parameters, the dates may have been entered incorrectly. Master Data Issues: The master data for the planning object may have incorrect date settings. Planning Version Issues: The planning version being used may have conflicting date settings.
Solution: Check Planning Horizon Settings: Navigate to the relevant planning area or planning book in SAP APO. Verify the settings for the planning horizon, ensuring that the start date is indeed before the end
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/CDPSOPT023
Start of optimization should fall within the optimization horizon
What causes this issue? The optimizer contains LiveCache data which relates to events within the optimization horizon. The optimizer does not receive...
/SAPAPO/CDPSOPT022
Mode costs may be too high
What causes this issue? The optimizer internally multiplies mode costs with mode duration. If the costs maintained are very high, as in this case, an...
/SAPAPO/CDPSOPT025
Data repair deactivated
What causes this issue? Data repair (repair function) checks data provided to the optimizer by <DS:GLOS.3588358C0A8515DCE10000009B38F9B9>SAP li...
/SAPAPO/CDPSOPT026
Termination when writing data to liveCache
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.