Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSFIXING -
Message number: 003
Message text: First resource selected has been reached
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSFIXING003
- First resource selected has been reached ?The SAP error message
/SAPAPO/CDPSFIXING003
with the description "First resource selected has been reached" typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly during the process of capacity planning or production scheduling. This error indicates that the system has reached the limit of the first resource selected for a particular operation or production order.Cause:
- Resource Capacity Limit: The primary cause of this error is that the capacity of the first resource (e.g., a machine or labor resource) has been fully utilized, and no additional capacity is available for the planned operation.
- Incorrect Resource Allocation: The resource may not be correctly allocated or configured in the system, leading to an inability to schedule additional operations.
- Planning Parameters: The planning parameters set for the resource may not allow for additional capacity to be utilized, such as maximum capacity settings or shifts.
- Order Overlap: There may be overlapping orders that are consuming the same resource, leading to a situation where the first resource is fully booked.
Solution:
- Check Resource Capacity: Review the capacity settings for the resource in question. Ensure that the capacity is sufficient for the planned operations. You may need to increase the available capacity or adjust the scheduling.
- Adjust Planning Parameters: Modify the planning parameters for the resource to allow for more flexibility in scheduling. This may include adjusting maximum capacity or shift settings.
- Reallocate Resources: If possible, consider reallocating the operation to a different resource that has available capacity.
- Review Production Orders: Check for any overlapping production orders that may be consuming the same resource. Adjust the scheduling of these orders to avoid conflicts.
- Use Alternative Resources: If the first resource is consistently reaching its capacity, consider using alternative resources or adding additional shifts to increase overall capacity.
- Consult Documentation: Refer to SAP documentation or support for specific configuration settings related to the resource in question.
Related Information:
/SAPAPO/CC01
(Capacity Check) or /SAPAPO/CC02
(Change Capacity) to analyze and adjust resource capacities.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSFIXING002
Specify an interval end date that lies in the planning period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSFIXING001
Specify an interval start date that lies in the planning period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSFIXING004
Last resource selected has been reached
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSFIXING005
The end of the interval must be later than the start of the interval
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.