Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSCUSTOMIZ -
Message number: 052
Message text: The planning period does not lie within the evaluation period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSCUSTOMIZ052
- The planning period does not lie within the evaluation period ?The SAP error message
/SAPAPO/CDPSCUSTOMIZ052
indicates that there is a mismatch between the planning period you are trying to use and the evaluation period defined in your system. This error typically occurs in the context of Advanced Planning and Optimization (APO) when you are trying to execute a planning function or transaction that requires a specific time frame.Cause:
Planning Period Mismatch: The planning period you are trying to use is outside the range of the evaluation period defined in the system. This could happen if:
- The planning horizon is set incorrectly.
- The evaluation period is not configured to include the desired planning period.
- The planning version or key figure settings are not aligned with the evaluation period.
Configuration Issues: There may be issues with the configuration of the planning area, planning version, or key figures that define the evaluation period.
Solution:
Check Planning Period: Verify the planning period you are trying to use. Ensure that it falls within the defined evaluation period. You can do this by:
- Navigating to the relevant planning area or planning version settings in SAP APO.
- Checking the configuration for the evaluation period.
Adjust Evaluation Period: If the planning period is correct but the evaluation period is too narrow, you may need to adjust the evaluation period settings to include the desired planning period.
Review Configuration:
- Go to the configuration settings for the planning area and check the settings for the planning version and key figures.
- Ensure that the settings are correctly aligned with the planning and evaluation periods.
Consult Documentation: If you are unsure about the configuration settings, refer to the SAP documentation or consult with your SAP Basis or APO consultant for guidance.
Testing: After making any changes, test the planning function again to ensure that the error is resolved.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC62
(for planning area) to check and modify settings.By following these steps, you should be able to resolve the error message /SAPAPO/CDPSCUSTOMIZ052
and ensure that your planning activities proceed without issues.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSCUSTOMIZ051
Enter a start date that is earlier than the finish date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSCUSTOMIZ050
Error in calculating period
What causes this issue? The system cannot convert your entries for the time period (type of period, start date and finish date) to a specific time in...
/SAPAPO/CDPSCUSTOMIZ060
System overrides strategy setting for fixed pegging
What causes this issue? You have made the following settings in the strategy profile for the pegging relationships: <ls>Dynamic Pegging: Consid...
/SAPAPO/CDPSCUSTOMIZ070
Relational operator requires a comparison value or a table field
What causes this issue? You have selected a binary relational operator. However, you have neither specified a comparison value nor a complete table f...
Click on this link to search all SAP messages.