Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/CDPSBATCH -
Message number: 014
Message text: An error has occurred in the production planning run.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/CDPSBATCH014
- An error has occurred in the production planning run. ?The SAP error message
/SAPAPO/CDPSBATCH014 An error has occurred in the production planning run
typically indicates that there was an issue during the execution of a production planning run in SAP Advanced Planning and Optimization (APO). This error can arise from various causes, and resolving it often requires a systematic approach to identify the underlying issue.Possible Causes:
- Data Issues: Missing or incorrect master data (e.g., materials, resources, production versions) can lead to errors during the planning run.
- Configuration Problems: Incorrect settings in the planning area, planning version, or other configuration settings can cause the planning run to fail.
- Resource Constraints: If there are insufficient resources (e.g., machines, labor) available for the planned production, it may lead to errors.
- Locking Issues: If another process is locking the data that the planning run needs to access, it can result in an error.
- Batch Job Issues: If the planning run is executed as a background job, issues with the job configuration or scheduling can lead to errors.
- System Performance: Performance issues, such as memory shortages or timeouts, can also cause the planning run to fail.
Solutions:
- Check Logs: Review the detailed logs for the planning run. You can find logs in transaction codes like
/SAPAPO/CDPSBATCH
or/SAPAPO/DP
to get more information about the error.- Validate Master Data: Ensure that all relevant master data is complete and accurate. Check for missing materials, resources, or incorrect configurations.
- Review Configuration: Verify the configuration settings for the planning area and version. Ensure that they are set up correctly and align with your planning requirements.
- Resource Availability: Check the availability of resources and ensure that they are not over-allocated or locked by other processes.
- Run in Foreground: If the planning run is executed as a background job, try running it in the foreground to see if you can get more detailed error messages.
- System Performance: Monitor system performance and check for any resource bottlenecks. If necessary, optimize the system or increase resources.
- Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address known issues related to this error message.
Related Information:
/SAPAPO/CDPSBATCH
for batch job monitoring and /SAPAPO/DP
for demand planning.If the issue persists after following these steps, it may be necessary to involve your SAP Basis team or SAP support for further investigation.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/CDPSBATCH013
Heuristic "&" does not allow a simulation version
What causes this issue? You are using a heuristic in mass scheduling for which it is not possible to save the changed schedule as a simulation versio...
/SAPAPO/CDPSBATCH012
Heuristic &1 cannot be used in the production planning run
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/CDPSBATCH015
Restrict the selection of resources in processing step &1
What causes this issue? You want to execute a heuristic, a planning function or optimization on resources, but have not specified any resources.Syste...
/SAPAPO/CDPSBATCH016
Restrict the selection of orders in processing step &1
What causes this issue? You want to execute a heuristic or planning function on orders but have not specified any orders.System Response The system ...
Click on this link to search all SAP messages.