How To Fix /SAPAPO/BWEX005 - Order &1 has operation start date very far in the future.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/BWEX -

  • Message number: 005

  • Message text: Order &1 has operation start date very far in the future.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/BWEX005 - Order &1 has operation start date very far in the future. ?

    The SAP error message /SAPAPO/BWEX005 Order &1 has operation start date very far in the future typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the scheduling of production orders or operations. This error indicates that the start date of an operation in a production order is set to a date that is significantly far in the future, which can lead to planning inconsistencies or unrealistic scheduling.

    Cause:

    1. Incorrect Date Settings: The operation's start date may have been set incorrectly, either manually or through a planning run.
    2. Planning Parameters: The planning parameters or settings in the APO system may not be configured correctly, leading to unrealistic scheduling.
    3. Data Inconsistencies: There may be inconsistencies in the master data, such as the production calendar, lead times, or resource availability.
    4. Long Lead Times: If the lead times for production are set too long, it can push the start date of operations far into the future.
    5. Capacity Constraints: If there are capacity constraints on resources, it may lead to scheduling operations far in advance.

    Solution:

    1. Check Operation Dates: Review the operation start dates in the production order and ensure they are set correctly. Adjust them if necessary.
    2. Review Planning Parameters: Check the planning parameters in the APO system to ensure they are set correctly. This includes lead times, production calendars, and resource availability.
    3. Adjust Lead Times: If lead times are excessively long, consider adjusting them to more realistic values.
    4. Capacity Planning: Review the capacity planning settings to ensure that resources are available when needed. Adjust the capacity or scheduling as necessary.
    5. Master Data Review: Ensure that all relevant master data (e.g., material master, work center, routing) is accurate and up to date.
    6. Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific recommendations or patches that may address the issue.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or MD04 (Stock/Requirements List) to investigate the production order and its scheduling.
    • SAP Notes: Check SAP Notes for any known issues or updates related to this error message.
    • APO Configuration: Review the configuration settings in the APO system, particularly those related to planning and scheduling.
    • User Exits and BAdIs: If custom logic is implemented, check for any user exits or BAdIs that might affect the scheduling logic.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant