How To Fix /SAPAPO/BLRG045 - Activities can be scheduled infinitely within the relative overload


/SAPAPO/BLRG045 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/BLRG -

  • Message number: 045

  • Message text: Activities can be scheduled infinitely within the relative overload

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/BLRG045 - Details

  • The SAP error message /SAPAPO/BLRG045 indicates that activities can be scheduled infinitely within the relative overload. This typically occurs in the context of Advanced Planning and Optimization (APO) when there are issues related to capacity planning and scheduling.
    
    Cause: Relative Overload Configuration: The error often arises when the relative overload settings in the planning book or the resource configuration allow for an unrealistic amount of scheduling. This can happen if the overload percentage is set too high, leading to the system allowing more activities than can realistically be handled. Resource Capacity Issues: If the resources are not properly defined or if their capacities are not set correctly, the system may not be able to determine a feasible schedule, resulting in this error. Planning Book Settings: Incorrect settings in the planning book, such as the way activities are defined or how they relate to resource capacities, can also lead to this error.
    Solution: Review Relative Overload Settings:

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/BLRG045 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant