How To Fix /SAPAPO/ATPLOG_PAL101 - End date was reset


/SAPAPO/ATPLOG_PAL101 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/ATPLOG_PAL -

  • Message number: 101

  • Message text: End date was reset

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/ATPLOG_PAL101 - End date was reset ?
    The SAP error message /SAPAPO/ATPLOG_PAL101 with the description "End date was reset" typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the planning or availability check process. This error indicates that the end date for a planning object (like a production order, purchase order, or stock transfer) has been reset, which can disrupt the planning process.
    Causes:
    
    Date Conflicts: The end date may have been reset due to conflicts with other planning parameters or settings, such as lead times, availability checks, or resource constraints.
    Master Data Issues: Incorrect or incomplete master data (like material master, resource master, or location master) can lead to inconsistencies that cause the end date to be reset.
    Planning Version Issues: If the planning version is not correctly set or if there are inconsistencies between different planning versions, it can lead to this error.
    User Input Errors: Manual changes to planning objects or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant