How To Fix /SAPAPO/ATP_BOP319 - Parallel execution of step &1 is not supported


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/ATP_BOP -

  • Message number: 319

  • Message text: Parallel execution of step &1 is not supported

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/ATP_BOP319 - Parallel execution of step &1 is not supported ?

    The SAP error message /SAPAPO/ATP_BOP319 Parallel execution of step &1 is not supported typically occurs in the context of Advanced Planning and Optimization (APO) when there is an attempt to execute a planning step in parallel that is not designed to support parallel execution. This can happen in various scenarios, such as during the execution of a planning run or when using certain functions in the APO system.

    Cause:

    1. Non-Parallelizable Steps: The specific step indicated by &1 in the error message is not designed to be executed in parallel. Some planning steps require a sequential execution due to dependencies on data or the nature of the calculations involved.
    2. Configuration Issues: There may be configuration settings in the APO system that dictate how certain planning runs are executed, which could lead to this error if not set up correctly.
    3. System Limitations: The underlying architecture of the APO system may impose limitations on parallel processing for certain operations.

    Solution:

    1. Check the Planning Step: Identify the specific planning step that is causing the error (indicated by &1). Review the documentation or configuration for that step to understand its execution requirements.
    2. Modify Execution Settings: If possible, adjust the execution settings to ensure that the step is run in a sequential manner rather than in parallel. This may involve changing settings in the planning run configuration.
    3. Review Custom Code: If there is any custom code or enhancements that are attempting to execute this step in parallel, review and modify the code to ensure it adheres to the sequential execution requirements.
    4. Consult SAP Notes: Check for any relevant SAP Notes or updates that may address this issue. SAP frequently releases notes that provide fixes or workarounds for known issues.
    5. Contact SAP Support: If the issue persists and you cannot find a resolution, consider reaching out to SAP Support for assistance. They may provide insights specific to your system configuration or version.

    Related Information:

    • SAP Documentation: Review the official SAP documentation for APO and the specific planning steps you are using. This can provide insights into the expected behavior and limitations of those steps.
    • Transaction Codes: Familiarize yourself with relevant transaction codes in APO that may help in monitoring or adjusting planning runs (e.g., /SAPAPO/MC90 for planning runs).
    • Performance Considerations: Understand the performance implications of running planning steps in parallel versus sequentially, as this can impact overall system performance and planning run times.

    By following these steps, you should be able to address the error and ensure that your planning processes in SAP APO run smoothly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant