Message type: E = Error
Message class: /SAPAPO/ATP_BOP -
Message number: 308
Message text: Increase the maximum number of processes started simultaneously
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP_BOP308
- Increase the maximum number of processes started simultaneously ?The SAP error message /SAPAPO/ATP_BOP308 indicates that the maximum number of processes that can be started simultaneously has been exceeded. This typically occurs in the context of Advanced Planning and Optimization (APO) when there are too many background processes or jobs trying to run at the same time, which can lead to performance issues or resource contention.
Cause: High Load: A large number of background jobs or processes are being executed simultaneously, which exceeds the configured limits. Configuration Limits: The system has a predefined limit for the number of parallel processes that can be executed, and this limit has been reached. Resource Constraints: The underlying hardware or system resources (CPU, memory) may be insufficient to handle the number of processes being requested.
Solution: Increase the Maximum Number of Processes: You can increase the limit for the maximum number of processes that can be started simultaneously. This can be done by adjusting the relevant configuration settings in the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/ATP_BOP307
Maximum group size is smaller than the minimum group size
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP306
No step was initialized for parallelization
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP309
Specify the number of minimum necessary groups
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP_BOP310
Of &1 work processes, currently &2 is/are available for parallelization
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.