Message type: E = Error
Message class: /SAPAPO/ATP -
Message number: 811
Message text: At least one basic method has caused a date shift
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/ATP811
- At least one basic method has caused a date shift ?The SAP error message /SAPAPO/ATP811 indicates that there is a date shift caused by at least one basic method in the Advanced Planning and Optimization (APO) module, specifically in the context of Available-to-Promise (ATP) checks. This error typically arises during the planning or execution of ATP checks when the system detects that the planned dates for certain operations or activities do not align correctly due to the basic methods defined in the system.
Cause: Basic Method Configuration: The basic methods used for planning (like heuristic methods, planning strategies, etc.) may not be configured correctly, leading to inconsistencies in date calculations. Data Inconsistencies: There may be inconsistencies in master data, such as product master, location master, or resource master, which can affect the planning process. Capacity Constraints: If there are capacity constraints on resources, it may lead to shifts in planned dates. Lead Times: Incorrect lead times defined in the system can also cause shifts in
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/ATP810
Conversion of &1 to &2 is not possible for product &3 in location &4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP809
Maintain the unit of measure displayed for product &1 and location &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP812
Only & & are available altogether, & & are already assigned
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/ATP815
ATP check for sublocation and/or version not activated
What causes this issue? In the check control, the "No sublocation check" indicator or the "No version check" indicator is set. Yo...
Click on this link to search all SAP messages.